SERVICES

Site-specific safety documents and practical H&S support.

No generic templates. Every RAMS, risk assessment, method statement and audit is built around the actual job, the people doing it and the site conditions in front of you.

Campbells Safety Solutions consultant
Most RAMS 3-5 days

with urgent turnaround available when the brief is complete.

WHAT WE COVER

Five core services for contractors, facilities teams and small businesses.

Use this page to choose the right level of support. If you are not sure what the principal contractor needs, send the brief and Andrew will scope it before quoting.

Service 01

Health & safety consultancy

A named competent person when you need clear, practical advice rather than template paperwork.

  • Competent-person support for contractors and small businesses
  • Policy, procedures and site advice written in plain English
  • Help responding to client, principal contractor or HSE requests
  • Retained or one-off support depending on the job
Health and safety consultancy
Service 02

Risk assessments

Task-specific assessments with realistic controls, clear scoring and enough detail for supervisors to brief the work properly.

  • 5x5 risk scoring with initial and residual ratings
  • Hazards matched to your task, location, access and plant
  • Controls written for the people actually doing the work
  • PDF and editable formats supplied with three rounds of revisions
Live Site Risk Reduction Mitigated
Working at height
High 15 Low 4
Manual handling
Med 9 Low 3
Dust & fumes
High 16 Med 8
Public interface
Med 12 Low 4
Risk Mitigation Index 78% Safe
Service 03

RAMS packages

Full risk assessment and method statement packs prepared for principal contractor submission.

  • Cover, approvals, hazard register and sequence of works
  • Controls, PPE, emergency procedure and briefing sheet
  • Operative sign-on register included
  • Three rounds of revision included as standard
From£395
Typical3-5 days
Revisions3 inc.
RAMS - Working at height Rev. 02
Cover & approvalsSigned
Hazard register5x5
Sequence of works8 steps
Controls & PPEReady
Briefing sheet1 page
Emergency procedureIncluded
Service 04

Method statements

Step-by-step instructions for the actual work, drafted around your programme and written in language operatives can follow.

  • Sequence of works built around your real programme
  • Plant, tool and material schedule per step
  • Permits, isolations and exclusions called out clearly
  • Optional principal-contractor formatting
Method Statement Blueprint Active sequence
1
Permit-to-work issued
Permit Required RAMS Ref: 3.1
2
Area cordon and signage
Exclusion Zone
3
Tower scaffold inspected
Tag Signed Working at Height
4
Components delivered safely
Manual Handling
5
Fix, assemble and sign off
QA Handover
Service 05

Safety audits

A real walk through the site with your supervisor, followed by a scored and prioritised report you can close out.

  • Audits aligned with HSG65 / ISO 45001 style frameworks
  • Scorecard across key site safety domains
  • Findings ranked by severity with realistic close-out dates
  • Re-visit option to verify actions closed
Audit Scorecard Sample Audit
Site organisation82%
Welfare facilities91%
PPE compliance76%
Working at height68%
Electrical safety85%
Overall score 80 / 100
Not sure which one you need?

A 20-minute call usually sorts it.

Send a quick description of the job. Andrew will tell you whether it needs a full RAMS, a single risk assessment, an audit or a quick walk-through.